intent-build-now

Start implementation from Intent. Validates Intent completeness, then either delegates to TaskSwarm (if available) or executes TDD phases directly. Use when you have an Intent ready and want to start building.

Safety Notice

This listing is imported from skills.sh public index metadata. Review upstream SKILL.md and repository scripts before running.

Copy this and send it to your AI assistant to learn

Install skill "intent-build-now" with this command: npx skills add arcblock/idd/arcblock-idd-intent-build-now

Intent Build Now

Start building from Intent. Validates completeness, then chooses execution path.

Workflow

/intent-build-now [path]
       ↓
Locate Intent + plan.md
       ↓
Validate completeness ──→ Incomplete? ──→ Show gaps, suggest /intent-plan
       ↓
Check for TaskSwarm
       │
       ├── Has TaskSwarm + TASK.yaml ──→ Delegate to /swarm run
       │
       └── No TaskSwarm ──→ Execute TDD phases directly

Step 1: Locate Files

Search for Intent files in order:

  1. User-specified path
  2. intent/{name}/ directories
  3. Current directory

Required files:

  • INTENT.md - The intent document
  • plan.md - Execution plan with test matrix

Optional:

  • TASK.yaml - TaskSwarm status file

If plan.md missing:

plan.md not found.

Run /intent-plan first to generate the execution plan.

Step 2: Validate Intent Completeness

Required Sections in INTENT.md

SectionPurposeHow to Fix
ResponsibilitiesWhat it does / doesn't doUse /intent-interview to clarify scope
StructureASCII diagram of componentsAdd ## Structure with ASCII diagram
APIFunction signaturesDefine key interfaces in ## API

Required in plan.md

CheckCriteria
PhasesHas ## Phase 0: or more phases
TestsEach phase has 6 test categories
E2E GateEach phase has ### E2E Gate
CheckboxesUses - [ ] format

If Not Ready

## Intent Validation: NEEDS WORK

Missing elements:

1. **plan.md missing E2E Gate for Phase 1**
   - Add `### E2E Gate` with verification script

2. **plan.md Phase 0 missing Data Leak tests**
   - Add `#### Data Leak` section with test cases

Run /intent-plan to regenerate, or fix manually.

Step 3: Choose Execution Path

Path A: TaskSwarm Available

Detect TaskSwarm by checking:

  1. TASK.yaml exists in intent directory
  2. TaskSwarm plugin is installed (check for /swarm skill)

If both conditions met:

## Intent Validation: PASSED ✓

TaskSwarm detected. Delegating execution...

Your Intent is ready. Run:

    /swarm run {task_name}

Or for continuous execution:

    /swarm run-all

TaskSwarm will:
- Claim the task atomically
- Execute phases with TDD discipline
- Update checkboxes in plan.md
- Commit after each phase
- Push to remote

Do NOT execute phases yourself when TaskSwarm is available.

Path B: No TaskSwarm (Direct Execution)

If TaskSwarm not available:

## Intent Validation: PASSED ✓

No TaskSwarm detected. Executing directly...

Starting Phase 0: {phase_name}

Then execute TDD loop for each phase:

For each Phase:
  1. Read ### Tests section
  2. For each unchecked test `- [ ]`:
     a. Write test code (if not exists)
     b. Run test → expect failure (red)
     c. Write implementation
     d. Run test → expect pass (green)
     e. Update plan.md: `- [ ]` → `- [x]`
  3. Run E2E Gate script
  4. Git commit: "feat({scope}): Phase {n} - {phase_name}"
  5. Continue to next Phase

Step 4: Completion

After all phases complete:

## Build Complete ✓

All phases executed:
- Phase 0: {name} ✓
- Phase 1: {name} ✓

Next steps:
- Run /intent-sync to update Intent with confirmed details
- Run /intent-check to verify consistency

Integration

/intent-interview     # Create Intent from scratch
    ↓
/intent-review        # Section-by-section approval
    ↓
/intent-plan          # Generate plan.md + TASK.yaml
    ↓
/intent-build-now     # THIS SKILL
    ↓
┌───────────────────────────────────────┐
│  Has TaskSwarm?                       │
│    Yes → /swarm run (delegate)        │
│    No  → Execute TDD directly         │
└───────────────────────────────────────┘
    ↓
/intent-sync          # Sync confirmed details back

TDD Execution Standards (Direct Mode)

When executing without TaskSwarm, follow strict TDD:

Test Categories (All 6 Required)

  1. Happy Path - Normal expected usage
  2. Bad Path - Invalid inputs, error conditions
  3. Edge Cases - Boundary conditions
  4. Security - Vulnerability prevention
  5. Data Leak - Information exposure prevention
  6. Data Damage - Data integrity protection

TDD Discipline

  • Tests First: Write ALL tests before implementation
  • Red-Green-Refactor: Verify test fails, implement, verify pass
  • No Skip: Every checkbox must be completed
  • Commit Per Phase: One commit after each phase passes

E2E Gate Enforcement

Each phase's E2E Gate script MUST pass before proceeding:

# Run the E2E Gate script from plan.md
# Example: pnpm test -- --grep "Phase 0"

# If fails: Stop and fix
# If passes: Continue to next phase

Tips

  1. Prefer TaskSwarm - It handles concurrency, heartbeat, and recovery
  2. Don't force incomplete Intents - Missing plan.md means not ready
  3. Respect checkboxes - They're the source of truth for progress
  4. Commit frequently - One commit per phase, not one mega-commit

Source Transparency

This detail page is rendered from real SKILL.md content. Trust labels are metadata-based hints, not a safety guarantee.

Related Skills

Related by shared tags or category signals.

General

intent-review

No summary provided by upstream source.

Repository SourceNeeds Review
General

intent-init

No summary provided by upstream source.

Repository SourceNeeds Review
General

intent-report

No summary provided by upstream source.

Repository SourceNeeds Review
General

intent-check

No summary provided by upstream source.

Repository SourceNeeds Review