When this skill is invoked:
Explicit invocation only: This skill should only run when the user explicitly requests it with /hotfix . Do not auto-invoke based on context matching.
Assess the emergency — Read the bug description or ID. Determine severity:
-
S1 (Critical): Game unplayable, data loss, security vulnerability — hotfix immediately
-
S2 (Major): Significant feature broken, workaround exists — hotfix within 24 hours
-
If severity is S3 or lower, recommend using the normal bug fix workflow instead
Create the hotfix record at production/hotfixes/hotfix-[date]-[short-name].md :
Hotfix: [Short Description]
Date: [Date] Severity: [S1/S2] Reporter: [Who found it] Status: IN PROGRESS
Problem
[Clear description of what is broken and the player impact]
Root Cause
[To be filled during investigation]
Fix
[To be filled during implementation]
Testing
[What was tested and how]
Approvals
- Fix reviewed by lead-programmer
- Regression test passed (qa-tester)
- Release approved (producer)
Rollback Plan
[How to revert if the fix causes new issues]
Create the hotfix branch (if git is initialized):
git checkout -b hotfix/[short-name] [release-tag-or-main]
Investigate and implement the fix — Focus on the minimal change that resolves the issue. Do NOT refactor, clean up, or add features alongside the hotfix.
Validate the fix — Run targeted tests for the affected system. Check for regressions in adjacent systems.
Update the hotfix record with root cause, fix details, and test results.
6b. Collect approvals — Use the Task tool to request sign-off:
-
subagent_type: lead-programmer — Review the fix for correctness and side effects
-
subagent_type: qa-tester — Run targeted regression tests on the affected system
-
subagent_type: producer — Approve deployment timing and communication plan
-
Output a summary with: severity, root cause, fix applied, testing status, and what approvals are still needed before deployment.
Rules
-
Hotfixes must be the MINIMUM change to fix the issue — no cleanup, no refactoring, no "while we're here" changes
-
Every hotfix must have a rollback plan documented before deployment
-
Hotfix branches merge to BOTH the release branch AND the development branch
-
All hotfixes require a post-incident review within 48 hours
-
If the fix is complex enough to need more than 4 hours, escalate to technical-director for a scope decision