Project Health Check Skill
Systematic assessment of individual project health across multiple dimensions.
Purpose
This skill provides a framework for:
-
Comprehensive project status assessment
-
Early warning identification
-
Root cause analysis
-
Recovery recommendation
-
Stakeholder communication
Prerequisites
Before health check, ensure:
Prerequisite Required For Source
Project baseline Variance calculation Project plan
Current status data Health assessment Project manager
Stakeholder feedback Satisfaction assessment Stakeholders
Risk register Risk health Risk analyst
Health Check Dimensions
Dimension 1: Schedule Health
Metrics:
Metric Formula Green Yellow Red
SPI EV / PV
= 0.95 0.85-0.94 < 0.85
Schedule Variance EV - PV
= 0 -5% to 0 < -5%
Milestone Status On-time %
= 90% 70-89% < 70%
Assessment Questions:
-
Is the project on schedule?
-
Are milestones being met?
-
What is causing any delays?
-
Is the critical path protected?
Dimension 2: Cost Health
Metrics:
Metric Formula Green Yellow Red
CPI EV / AC
= 0.95 0.85-0.94 < 0.85
Cost Variance EV - AC
= 0 -5% to 0 < -5%
EAC vs Budget EAC / BAC <= 1.05 1.05-1.15
1.15
Assessment Questions:
-
Is the project within budget?
-
What is driving cost variance?
-
Is the estimate at completion acceptable?
-
Are there unplanned costs emerging?
Dimension 3: Scope Health
Metrics:
Metric Green Yellow Red
Scope Changes < 3 3-5
5
Change Impact < 5% baseline 5-10%
10%
Requirements Stability Stable Some changes Significant flux
Assessment Questions:
-
Is scope under control?
-
How many changes since baseline?
-
What is driving scope changes?
-
Is there scope creep occurring?
Dimension 4: Quality Health
Metrics:
Metric Green Yellow Red
Defect Rate Below target At target Above target
Rework % < 10% 10-20%
20%
Test Pass Rate
95% 85-95% < 85%
Assessment Questions:
-
Is quality acceptable?
-
What is the defect trend?
-
Is rework manageable?
-
Are acceptance criteria being met?
Dimension 5: Risk Health
Metrics:
Metric Green Yellow Red
Open Critical Risks 0 1-2
2
Risk Trend Decreasing Stable Increasing
Mitigation Progress On track Delayed Blocked
Assessment Questions:
-
Are risks being managed?
-
Are mitigations effective?
-
Any new critical risks?
-
Are issues being resolved?
Dimension 6: Stakeholder Health
Metrics:
Metric Green Yellow Red
Stakeholder Satisfaction Satisfied Concerns Escalations
Communication Effectiveness Good Gaps noted Major issues
Decision Timeliness Timely Some delays Blocked
Assessment Questions:
-
Are stakeholders satisfied?
-
Is communication effective?
-
Are decisions being made timely?
-
Any relationship issues?
Health Check Gates
Gate 1: Data Collection
Objective: Gather current project data
Actions:
-
Collect schedule data (actuals, forecasts)
-
Collect cost data (actuals, forecasts)
-
Review scope changes
-
Review quality metrics
-
Update risk register
-
Gather stakeholder feedback
Output: docs/pmo/{date}/project-{name}-data.md
Gate 2: Health Assessment
Objective: Assess each dimension and overall health
Actions:
-
Score each dimension (1-10)
-
Calculate overall health score
-
Identify red flags
-
Document root causes
Health Score Calculation:
Dimension Weight
Schedule 25%
Cost 20%
Scope 15%
Quality 20%
Risk 10%
Stakeholder 10%
Overall Score Interpretation:
-
8-10: Healthy
-
6-7.9: Manageable
-
4-5.9: At Risk
-
< 4: Critical
Output: docs/pmo/{date}/project-{name}-assessment.md
Gate 3: Recommendations
Objective: Provide actionable recommendations
Actions:
-
Prioritize issues by impact
-
Identify quick wins
-
Recommend recovery actions
-
Define success criteria
Recommendation Categories:
Category Urgency Examples
Immediate This week Escalation, resource injection
Short-term This month Process change, replan
Medium-term This quarter Restructure, descope
Long-term Future Lessons learned, prevention
Output: docs/pmo/{date}/project-{name}-recommendations.md
Anti-Rationalization Table
See shared-patterns/anti-rationalization.md for universal anti-rationalizations.
Health Check-Specific Anti-Rationalizations
Rationalization Why It's WRONG Required Action
"PM says project is green" Self-reported status often optimistic. Verify with data. Validate with metrics
"One dimension is off, overall is fine" One critical dimension can sink a project. Address all yellow/red dimensions
"Wait and see if it improves" Delays compound problems. Early intervention is cheaper. Act on warning signs
"They're aware of the issues" Awareness ≠ action. Verify mitigation progress. Confirm corrective actions
Pressure Resistance
See shared-patterns/pressure-resistance.md for universal pressure scenarios.
Health Check-Specific Pressures
Pressure Type Request Agent Response
"Make the status green for the exec report" "Status must reflect reality. Will provide accurate status with context and recovery plan."
"Don't dig into that dimension" "All dimensions must be assessed. Selective assessment misses problems."
"The PM has it under control" "PM optimism is natural. Independent assessment provides balance."
Blocker Criteria - STOP and Report
ALWAYS pause and report blocker for:
Situation Required Action
Overall health < 4 (Critical) STOP. Immediate executive escalation required.
Multiple dimensions Red STOP. Recovery intervention needed.
Data unavailable for assessment STOP. Cannot assess without data. Request information.
Stakeholder loss of confidence STOP. Relationship repair needed before project work.
Cannot Be Overridden
The following requirements are NON-NEGOTIABLE:
Requirement Cannot Override Because
All six dimensions assessed Partial assessment misses critical issues
Data-driven scoring Opinions without data lead to wrong conclusions
Root cause analysis for Red Symptoms without causes cannot be fixed
Evidence-based status Feelings don't predict project outcomes
Stakeholder feedback inclusion Project health includes perception, not just metrics
If user insists on violating these:
-
Escalate to orchestrator
-
Do NOT proceed with incomplete assessment
-
Document the request and your refusal
Severity Calibration
When assessing health check findings:
Severity Criteria Examples
CRITICAL Project viability at risk Overall health < 4, sponsor withdrawing, budget frozen
HIGH Significant intervention needed Any dimension Red, schedule slip > 2 weeks, cost overrun > 15%
MEDIUM Active management required Dimensions Yellow, minor variances, stakeholder concerns
LOW Normal monitoring All Green with minor improvements possible
Escalate CRITICAL immediately. Address HIGH this week. Monitor MEDIUM bi-weekly.
Output Format
Health Check Report
Project Health Check - [Project Name] - [Date]
Overall Health Score: X/10 - [Green/Yellow/Red]
Dimension Scores
| Dimension | Score | Status | Trend |
|---|---|---|---|
| Schedule | X/10 | G/Y/R | Up/Stable/Down |
| Cost | X/10 | G/Y/R | Up/Stable/Down |
| Scope | X/10 | G/Y/R | Up/Stable/Down |
| Quality | X/10 | G/Y/R | Up/Stable/Down |
| Risk | X/10 | G/Y/R | Up/Stable/Down |
| Stakeholder | X/10 | G/Y/R | Up/Stable/Down |
Key Findings
Red Flags
- [Finding with evidence]
Yellow Flags
- [Finding with evidence]
Positive Signs
- [Finding with evidence]
Root Cause Analysis
| Issue | Root Cause | Impact |
|---|---|---|
| [Issue] | [Cause] | [Impact] |
Recommendations
Immediate (This Week)
- [Action] - Owner: [Name]
Short-term (This Month)
- [Action] - Owner: [Name]
Decisions Required
- [Decision needed with options]
Execution Report
Base metrics per shared-patterns/execution-report.md:
Metric Value
Analysis Date YYYY-MM-DD
Scope [Project name]
Duration Xh Ym
Result COMPLETE/PARTIAL/BLOCKED
Health Check-Specific Details
Metric Value
health_score X/10
schedule_variance X%
cost_variance X%
scope_changes N
When Health Check Is Not Needed
Condition Verification
Recent check exists (<14 days) Reference existing health check
No reported issues Confirm no new risks or blockers
Project in maintenance phase Verify no active development
Stakeholders satisfied Confirm no escalations or concerns
MUST: Full health check REQUIRED for the following conditions:
Condition Why Required
Project status changed Yellow/Red requires immediate assessment
Milestone approaching Risk assessment needed before milestone
Stakeholder escalation received Must diagnose the concern
Project phase transition Entry/exit criteria must be validated
Periodic review cadence Regular health monitoring required
MUST: When in doubt, conduct the health check. Undetected issues become crises.